Demonstrate the following: Start up. BASIC ELECTRICAL REQUIREMENTS . are not concealed by new work. Electrical inspection shall be by the [third (3rd) Party Inspector approved by the Maryland State Fire Marshall] [UMB inspection department personnel]. 1.08 TESTING A. 0000000016 00000 n 0000002809 00000 n Notification of completion of testing shall be sent to the COMPANY . NESC (National Electrical Safety Code). Where coordination requirements conflict with individual system requirements, refer conflict to UMB. NETA (National Electrical Testing Association). PROTECTION OF WORK Protect work, material and equipment from weather and construction operations before and after installation. !y-P+O`_ )q|ero-UPO]GmlQ^+RDdi*>Z The following list shall be used as a guide only: Equipment such as transformers, generators, etc. In addition to the following list, submit other shop drawings as may be requested by UMB: Divisions 26, 27, & 28: Compression Wire Connectors Fire Resistant Sealant Ground Wire Surface Raceway Wireways Raceway, Boxes and Cabinets Wires and Cables Fire Alarm System: Refer to Division 28 Section Digital, Addressable Fire Alarm System for submittal requirements In instances of complex field wired systems, including but not limited to: fire alarm system, the contractor shall submit: Cut sheets of every component such as control panels, fire alarm devices, wire, etc. . ?\ 2j0D,xl>Kc2)b01UBu0% ## d X%XIL hb```x ,M[Vcv/?LyS:wIf{[zX#F2\3vdzDlLt0t0 h )@" 110wc {_1``Y P Control sequences. service companies, and controlling agencies. Prepare floor plans, elevations, and details to indicate penetrations in floors, walls, and ceilings and their relationship to other penetrations and installations. 4. The Architect/ Engineer will not perform any punch list verification until all items have been completed, initialed, dated and the list returned to the Architect/Engineer. 0000002122 00000 n _^QD!;\m6~D#}g}F\jf#Mt2tNT%$PkQwJuhN)2>IL gVV[ NYo8 bT6&/"I9k8rq#|,p]UW.nD,e$#)GY9AV/8JWh(tsU T/! hbbd```b``+XLVH&06K 0&_d9;H2b&Ff=~ 90 Clean each surface or unit to the condition expected in a normal, commercial building cleaning and maintenance program. REPAIRS & RESTORATION OF SURFACES AND FINISHES: Restore all finishes, equipment and surfaces to original condition, where affected by the work. SECTION 16010 - BASIC ELECTRICAL REQUIREMENTS SECTION 16111 - CONDUITS SECTION 16118 - DUCTBANK SECTION 16121 - MEDIUM VOLTAGE CABLE SECTION 16123 - BUILDING WIRES AND CABLES SECTION 16130 - BOXES SECTION 16140 - WIRING DEVICES SECTION 16160 - ENCLOSURES SECTION 16170 - GROUNDING AND BONDING SECTION 16180 - EQUIPMENT WIRING SYSTEMS SECTION 16190 View Specification PDF - The Pennsylvania Turnpike. Maximum length: (six 6) feet, except where fished. ?Cc\C,Ns[Tj*I3t3kZ pd(68 Ulz afdb`dg4baTfX:r-X5)H! PART 1 - GENERAL . Power Distribution System. PROVISIONS FOR ACCESS Furnish and install adequate access to all electrical components. &F >`>a$gd$ ^ gd;F $ 0 Supplementary Conditions and Division-1 Specification Sections, apply to this Section. Submittal File Format: File formats for each submittal shall be electronically as follows: Product Data: pdf file format. left on top of ceilings and ceiling tiles. 1.2 Page 1 of 4 REFERENCES .1 American National Standards Institute/Institute of Electrical and Electronics Engineers (ANSI/IEEE). .1 .2 ANSI/IEEE 837, Qualifying Permanent Connections . hb```,G@(b``oI Coordinate requirements for access panels and doors where electrical items requiring access are concealed behind finished surfaces. Comply with requirements of governing regulations, franchised service companies, and controlling agencies. SECTION 16010 -- GENERAL PROVISIONS DEFINITIONS Accepted/Approved: Shall mean accepted by the Project Representative. DEMOLITION: Remove and dispose of all existing materials not required for re-use or reinstallation. SECTION 16010 ELECTRICAL GENERAL PROVISIONS SECTION 16010 ELECTRICAL GENERAL PROVISIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under this Section. Access doors. SECTION 16010 - GENERAL PROVISIONS. Notify UMB in advance of scheduled inspections. 11275 0 obj <>/Filter/FlateDecode/ID[<1BCD9CA6C4893D4A874390606B4A9A2F>]/Index[11261 22]/Info 11260 0 R/Length 76/Prev 791633/Root 11262 0 R/Size 11283/Type/XRef/W[1 2 1]>>stream EN. Verify all dimensions by field measurements. Services include: Electrical penetrations include conduits and cables. UL (Underwriters Laboratories). 434-2007 Page 1 of 1 _____ INDEX OF SPECIFICATION 16010 Electrical, General Requirements 16122 Electrical, Wire and Cable 16133 Electrical, Conduits and Fittings 16225 Electrical, Control Panel . Complete inventory of spare parts and materials. hbbd``b`$f n2 w}L %X0 8 Any defects in workmanship, materials, or performance which appear within the guarantee period shall be corrected by the contractor without cost to the owner, within a reasonable time, to be specified by UMB. 16010 - 1 . Cleaning. The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. Timkens deep groove ball bearings deliver reliable performance in a wide range of applications and conditions. . REFERENCED ORGANIZATIONS AND CODES The following list of abbreviations are included within the specifications and are provided as a reference. Specifications and Drawings are prepared in abbreviated form and includes incomplete sentences. B. All other materials removed shall become the property of the Contractor and shall be removed from the premises. 2020 0 obj <>stream }T+A&p~lA&K9V=Zp-8ysG.n{@K?zpW\{\ZZgZU%]M:z ^HsRoiSD-G[ 5#)\EENX6 ELECTRICAL GENERAL PROVISIONS . Arrange for chases, slots, and openings in building structure during progress of construction to allow for electrical installations. These cookies will be stored in your browser only with your consent. Perform cutting, fitting, and patching of electrical equipment and materials required to: Uncover Work to provide for installation of ill timed Work. 6glqqS6&2S0gW Also include the address, phone number and contact person for each supplier. Effective energy utilization. Only one submission per System Integrator will be allowed. For equipment rough-in requirements see specifications for electrical equipment. All submitted materials and equipment are subject to approval by the A/E and UMB. Housekeeping Pads: Pads shall be minimum of four (4) inches wider and longer than structural base of equipment being set on pad. hbbd``b` $Z ~BARD0 !LAF10t' M0*``mvle}vw$ms3s%)[Fpk, V7#`,kzp:dM b([0.@Sk8@KGq4EY2:":@DD L'czU4,f53( iX 89 IL?nL"a n[. EQUIPMENT PROVIDED UNDER ANOTHER DIVISION AND BY OTHERS The Installer of products under Divisions 26, 27, & 28 shall make all system connections required to equipment furnished and installed under another division and by others. 8&Zdl6xHc`p(N:cy$f430o"NNN_r u2Mrf\[7Hcr Prepare reflected ceiling plans to coordinate and integrate installations, air outlets and inlets, light fixtures, communication systems components, cable trays, sprinklers, access doors and other ceiling mounted items. <<8444751DFCD0354687F9FE76EBE71065>]>> C. unless otherwise noted. 3 electrical and mechanical specifications, specifications for electrical unit substation . Replace ceiling tiles where removal has left holes or cuts in original tiles. #Zkh f9\!A>V=#JM;:Dw. Preliminary programming information. endstream endobj 2010 0 obj <>stream The drawings and specifications shall be followed in layout of work. SCOPE OF WORK . Section 16151 - Vertical Hollowshaft Electric Motors . As much as practical, connect equipment for ease of disconnecting, with minimum of interference with other installations. When the successful bidder chooses to provide or approved equal equipment by one (1) of the other listed manufacturers in the specifications, the bidder shall be responsible for providing all adjustments and modifications to the services necessary to make connections to the equipment, the bidder shall be responsible for installing the equipment such that all required clear access space is maintained, and the bidder shall be responsible for providing all adjustments and modifications to the equipment mounting and supports. 0000003026 00000 n Shop drawings detailing fabrication and installation requirements for electrical equipment. 0 Prospective subcontractors under this section are cautioned that the unauthorized operation of electrical equipment or other control devices by their personnel can result in extremely serious consequences for which the contractor will be held accountable. Safety procedures. ph p hf h8 >*B* Coordinate installation of identifying devices after completing covering and painting where devices are applied to surfaces. This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. ` I Provide the following, where applicable, in accordance with accepted trade standards and to Owners satisfaction: Replace damaged ceiling tiles. Environmental Sustainability %PDF-1.6 % Diagrams shall indicate cable on raceway between points. Install all components and equipment per manufacturers written instructions. Refer to General Requirements of Division 01 for additional requirements pertaining to Submittals and Record Drawings. Ends shall be capped with push plugs for future use. Part Number 16010, Narrow Section Ball Bearings (16000, 16100). Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. Install equipment and materials in existing structures. Housekeeping Pads: Set all floor-mounted equipment on four (4) inch high concrete housekeeping pads, unless otherwise shown or specified. startxref 0000003103 00000 n Unless otherwise indicated the coordination drawings, including plans, sections, and elevations shall be prepared at a scale of not less than 1/4 inch = 1 foot- 0 inches. If any items have been initialed as being completed by the Contractor and the Architect/Engineer determines that the work is not complete, the Architect/Engineer shall be reimbursed by the Contractor at his regular hourly rate for any and all items requiring revisiting of the site by the Architect/Engineer.
Sims 4 Graduation Pose Pack, How Much Is A 1995 Magmar Worth, Articles S